10.12 “FUCS” ( F ast U nbalance C ontrol S ystem) The control procedure for unbalanced loads is performed dynamically, before each spin cycle, as follows: Є The phase begins at a speed of 55 rpm; the speed can never fall below this threshold, otherwise the check is repeated. Є At intervals of 300 ms, the balance is calculated and compared with predetermined limits. If the value is less than the lower limit, the speed of the drum is increased by a certain value depending on the transmission relation between motor pulley/drum; if the unbalancing is higher, it is decreased by the same value.
The reduction in the speed of the drum distributes the washing correctly; this procedure is repeated until the wash load is completely balanced. Є Correct balancing of the wash load is achieved at a speed of 115 rpm, after which the spin cycle begins. The Unbalancing Control function takes place in different phases: each phase is characterized by: Є an unbalancing index (0-1-2-3) Є an unbalancing threshold value (ex: 850, 350, 650, 1100rpm) Є a time out (max. time) Ending of the FUCS balancing phase The phase is ended when: Є The drum rotation speed is 115 rpm (or 85rpm in some cases of unbalancing index). In this case the spin is performed.
Є In some cases the optimal balancing value is not reached: a reduced spin is performed depending on the unbalancing. Є In the worst case, in which all phases are not sufficient to reach a minimum balancing value, the spin is not performed. Example of perfect balancing rpm SOI/DT 2007-11 dmm 49/69 599 70 39-88 Real speed Selected speed Phase 0, Time-out=60 sec Phase 1 Time-out=60 sec 115 rpm 55 rpm