sinee — Руководство по эксплуатации SINEE EM760 — высокоэффективный инвертор (EN)

User’s Guide for EM760 series high-performance vector inverter Chapter 5 Trial Run 5.1 Inverter Commissioning Process Start 开始 Install the inverter and the PG card following instructions in Chapter 2 and Chapter 3, and 按照第2章、第3章的说明安装变频器、PG卡,完成接线 complete the wiring 接通电源前,确认安全及接线正确(5.2节) Before turning on the power supply, check the safety and wiring for correctness (5.2) Enter the motor nameplate parameters and encoder parameters; perform parameter 输入电机铭牌参数、编码器参数,执行参数辨识(5.7节) identification (5.7) 根据需要进行应用宏设定或根据设备自行设定工艺参数 Set application macro as needed or set process parameters based on the equipment Control method 控制方式 F00.01 F00.01=0 F00.01=2 F00.01=1 V/F控制 设置F05组相关参数 V/F control:

set F05 group Open-loop vector control: set 开环矢量控制 设置F06组相关参数 Closed-loop vector adjustment 闭环矢量调试 related parameters group F06-related parameters (5. 8) (5.8节) Control the no-load running via the keyboard, and confirm the correctness of the rotation direction of the motor and mechanical action of the system. 键盘控制空载运行,确认电机旋转方向和系统机械动作正常 Change F00.02 to the desired command source, perform no-load running, and confirm the normal mechanical action of the system. 修改F00.02为需要的命令源,空载运行,确认系统机械动作正常 Perform the on-load running inspection and check whether the running meets relevant 带载运行检查,确认运行情况是否满足要求 requirements. 结束 End Fig.

5-1 Inverter Commissioning Flowchart 34 After tu接rnin通g o电n th源e po后we,r su确pply认, ch状eck态 the正 sta确tus( for 5co.r3re节ctne)ss (5.3)