Downloaded from https://www.everyspec.com AMCP 70-1l7 All random distributions used for digital statistical difficulties arise if the test rejults computers are pseudo-random. Since a pat- are to be used to assess the reliability poten- tern is used to generate the pseudo-random tial of the system. Such tests may be part of numbers, modest attention ought to be the design-development program, and the reli- devoted to being assured that the numbers ability data obtained may be a byproduct will behave well enough for your particular rather than the end result of the test. There- simulation.
Rarely in reliability work will dif- fore, there is no longer a controlled condition ficulties from this source arise, but it can hap- in the statistical sense, and the analyst is pen. forced to work with the information that be- comes available. 11-5 APPLICATIONS The synthesis of system reliability from the results of subsystem tests is not a simple In principle, the demonstration of the reli- problem. As a rule, each subsystem type will ability of a system is a fairly straightforward be run a different number of total operating procedure. Take several systems, operate hours, and different numbers of failures will them for a sufficient length of time, record be observed.
~the number of failures which occur, and ethe e of wur an To illustrate the second point, consider a evaluate the results by one of a number of simple series (1-out-of-3:i) system consisting available statistical techniques. Unfortunately, of 3 s-Independent subsystems, with the oper- this is not practical - particularly for dealing ating times and observed failures indicated in with complex, costly systems. Even an opti- Table 11-2. mum mix of time, available systems, man- power, and test facilities is often economical- The subsystems have constet failure . ly prohibitive, rates.
The failure rate of the system is just the sum of the subsystem failure rates, and we Because of the complexity of many ys- could try the same formula using the esti- ters, extensive tests at the system level often mated failure rates from Table 11-2, viz. are limitei because of time, facilities, cost, , and schedules. Instead, extensive testing gen- , (0.40 + 0.25 + 0.20) per 1000 hr = erally is done at the subsystem level. This per- 0.85 per 1000 hr; X is an estimate of the fail- mils testing to be conducted earlier in a pro- ure rate ). We have an estimate of X,; but, (as gram, and reveals potential difficulties at the mentioned in Chapter 4 "Review of Statistical earliest possible time.
Two management and Theory") the trick is, not to get an estimate TABLE 11-2 SUMMARY OF SUBSYSTEM OPERATING TIMES, FAILURES, FAILURE-RATE ESTIMATES AND sCONFIDENCE INTERVALS FOR FAILURE RATES Tet toppe A sonfi Total operating after r A, - rt, interval for k time t. hr failurm ne 1000 hr lower 5% uRMe 5% 1 5000 2 0.40 0.071 0.95 2 8000 2 0.25 0.044 0.59 3. 10000 2 0.20 0.036 0.47 System - 0.85 ? ? 1A ______ _ _ _ __, Aj is an estin'ate of the true failure rate X. The -confidenve intervals were obtained from a table of the chi-square distribution; 2 Xt has a chi-square distribution with 2r degres of freedom. From tables such as those in Part Six, Mathematical Appendix and Glopznt.
fer 4 degreas of freedom, the lower 5% point is x 2 0.711 and the upper 5% point is X' 9.49. ,. bound - X 2 /(2t). 11-3