Downloaded from https://www.everyspec.com AMCP 700-260 Top Barrel Firing Station Top Barrel Ramming Station-\ p-Top Barrel Ejection Station Bottom Barral Ejection Station "-Bottom Barrel Ramming Station Bottom Barrel Firing Station-- Figure 5-11. Location of Bavi" "perations CD)D0 0 (A) (B) (C) (P) Figure 5-12. Schematic of Double Barrel Drum-cam Arrangements 6-47