Downloaded from https://www.everyspec.com AMCP 706-M Z = ,FA.. +eKi -. vT .. /RIR.,iQ1 w 1WAJ 15, Cn.tir:sting 0.000611 =0.00785 [Sill( 630x + 71 Sin'1 711) 0.0778 - Sin' (0.4674 0 + 0.5274) - Sin q 0.5274 Sin (0.4674x, 0 + 0.5274) - 310 50' + 40 28' - 360 18' 0.4674x,, 0.5Q20 - 0.5274 = 0.06.i6 Xto = 0.138 in. The barrel bas 0.862 in. to go to complete its I _386.A 1 buffer stroke. The time needed to tranverse this 2 sbM, 2 x 0.3 x 50 distance i obtained from Eqs. 2-60c and 2-61c. alculate the constants In Eq. 2-60c. .... 1_ L 386.4 7.73 in./(lb-se, 1 ) 2CM, 2 x 0.5 x 50 / \10 4 cM. - 4 0.5 3-g-" = 0.0518 lb-sec 2 /in.
K 5.8 x 386.4 6 4eM, 4 x 0.5 x .50 = 22.41/se 1 =__ 386,4 = 38.64 inI(lb-sec 2 ) 2 cMb 2 x 0.5 x I0 Substitute in Eq, 2-6 1c. K _ S.8 x 386.4 i;Mb 4x,Sx 10 1121lec" Substitute these vahies Into Eq. 2-60c. At- l 2 S8b(n 1) At" u[ A 3+ 7.73F(- A t ' + 22.41At2AxJ Ax a B (n . - ) A t - 38 64 F ( M a- (2) A t ) + 112 At2AXI (2-68a) 0.0776 where A a 0.0776 + 316.7At 2 where B - 0.051 -- Solve for the various parameters and then for At. 0.0518+5.8 &t 2 Calculate the c(unstants in Eq. 2--61c. 1.00 - 0.138 0.862 in. Ax t a xr. ,0-0.8 0.6i, 4eebMt 4 x 0.5 x 0,3 x 50 =eebM, - 386.4 0.0776 lb-sec'/in. The driving spring forcc is estimated as the average eKb + ebK a0.5 x 630+0.3 x5.8 = 316.7lb/In.
during this period 2-?1