Downloaded from https://www.everyspec.com Spectrum True RMS Frequency Distortion Meter (See Note 4) (See Note 4) (See Note 4) (See Note 4) Analyzer Voltmeter Counter A MIL-HDBK-704-3 (UUT) Programmable AC 3-Phase Power Supply N C B Unit Under Test 42 See Note 2 N IF USED 10 cm GND CHASSIS See Note 3 CAUTION Notes: Ground Plane 1. Voltage measurements shall be made within 10 cm of UUT input power terminals. 2. For 3 phase 4 wire equipment, neutral connection to also be made within 10 cm of UUT input power Stimulation & Monitoring terminals. For 3 phase 3 wire equipment, line-to-neutral measurements to be made with neutral connection made to power supply neutral. Equipment (See Note 5) 3.
CAUTION: Verify suitability of power supply NEUTRAL and GROUND connections. 4. CAUTION: Verify suitability of instumentation inputs and/or use appropriate attenuation. 5. Stimulation and Monitoring Equipment are user defined. This functional block shall provide appropriate inputs (stimulations) and monitor UUT outputs (e.g.: RPM, signals, data, etc.) Total Voltage Distortion Figure TAC107-1 FIGURE TAC107-1. Total voltage distortion. B C