Downloaded from https://www.everyspec.com Oscilloscope True RMS Frequency Voltmeter Counter (See Note 4) (See Note 4) (See Note 4) See Note 1 A A MIL-HDBK-704-3 (UUT) Programmable C B Unit Under Test 65 AC 3-Phase Power Supply N See Note 2 N IF USED 10 cm GND CHASSIS See Note 3 CAUTION Notes: Ground Plane 1. Voltage measurements shall be made within 10 cm of UUT input power terminals. 2. For 3 phase 4 wire equipment, neutral connection to also be made within 10 cm of UUT input Stimulation & Monitoring power terminals. For 3 phase 3 wire equipment, line-to-neutral measurements to be made with neutral connection made to power supply neutral. Equipment (See Note 5) 3. CAUTION:
Verify suitability of power supply NEUTRAL and GROUND connections. 4. CAUTION: Verify suitability of instumentation inputs and/or use appropriate attenuation. 5. Stimulation and Monitoring Equipment are user defined. This functional block shall provide appropriate inputs (stimulations) and monitor UUT outputs (e.g.: RPM, signals, data, etc.) Normal Frequency Transients Figure TAC110-1 FIGURE TAC110-1. Normal frequency transients. B C