Downloaded from https://www.everyspec.com MIL-HDBK-704-3 METHOD TAC201 Power Interrupt POWER GROUP: Three Phase, 400 Hz, 115 V AIRCRAFT ELECTRICAL OPERATING CONDITION: Transfer Interrupt PARAMETER: Power Interrupt 1. Scope. 1.1 Purpose. This test procedure is used to verify that three phase, 115 Volt, 400 Hz power utilization equipment operates and maintains specified performance when subjected to power interrupts as specified in the applicable edition(s) of MIL-STD-704. 2. Validation criteria.
The utilization equipment is considered to have passed if the utilization equipment operates and maintains performance as specified in the utilization equipment performance specification document for transfer aircraft electrical conditions when subjected to power interrupts as specified by the applicable edition(s) of MIL-STD-704 and as noted in table TAC201-I. The utilization equipment must maintain the specified performance during power interrupts.
Unless otherwise specified in the utilization equipment performance specification document, the utilization equipment must automatically return to the performance specified for normal aircraft electrical conditions when the power returns to within normal limits. The utilization equipment must not suffer damage or cause an unsafe condition. TABLE TAC201-I. MIL-STD-704 power transfer limits. 3. Apparatus. The test equipment should be as follows: a. Programmable AC power supply b. True RMS voltmeter c. Frequency counter d. Oscilloscope e. Resistive dummy load 4. Test setup. Configure the test setup as shown in figure TAC201-1.
The dummy resistive load placed in parallel to the UUT should be sized to draw three times the steady state current of the UUT up to a maximum of 25 kW dummy load. Note: This is done to ensure that the UUT test 70 Limit 704A 704B 704C 704D 704E 704F Power Interrupt 50 msec 50 msec 50 msec 50 msec 50 msec 50 msec Voltage NLSS 108 V 108 V 108 V 108 V 108 V 108 V Voltage NHSS 118 V 118 V 118 V 118 V 118 V 118 V