everyspec.com hydraulic manual — Chapter 2 - Pneudraulic Lines

Downloaded from https://www.everyspec.com FM 1-509 connecting lines or by rotating fittings. (See Figure 2-23.) Connect both ends of the tubing, and tighten them until an increase in resistance to turning is encountered in the B-nut. At this point, tighten the clamps and ensure that they do not pull the tubing out of alignment; place clamps in a binding position. Complete the installation by turning the B-nut one-sixth of a turn. Pressurize the hydraulic system and inspect for leaks. If leakage is noted, release system pressure and back off (loosen completely) the B-nut.

If possible, rotate the sleeve to a new position, and then retorque the B-nut to its previous position plus one-sixth of a turn. Normally this action will stop the leak; if it does not, replace the assembly. When connecting tubing to an MS fitting, refer to Table 2-2 for the torque and flat-turn values for nuts on flareless tubing. 2-24