Workflow before Beginning Work Workflow before Beginning Work This section describes the items to be checked before beginning work. Workflow Operations and Check Items for Rear Side 2. Checking the Air Pressure ( Page 32 ) 1. Turning On the Compressed Air Equipment ( Page 32 ) 3. Removing the Stopper Pin of the Pressure Roller ( Page 33 ) Operations and Check Items for Front Side 1. Supply Water to and Check the Belt Cleaning Unit ( Page 34 ) 2. Check the Amount of Waste Ink Remaining in the Waste Ink Tank ( Page 35 ) Other 1. Prepare the Fabric ( Page 36 ) 2. Adjusting the Fabric Peeling Prevention Bar ( Page 37 ) 3. Checking Operating Parts ( Page 41 ) 4.
Checking the Exhaust Equipment ( Page 42 ) Procedure for Turning on the Power 1. Pushing an Emergency Stop Button for an Emergency Stop ( Page 43 ) 2. Turning On the Power ( Page 43 ) 3. Starting Leonardo ( Page 44 ) 4. Releasing an Emergency Stop Button ( Page 45 ) 5. Executing Set Point ( Page 46 ) Operations and Check Items After Turning on the Power 1. Check the Operation of the Emergency Stop Equipment ( Page 47 ) 2. Inspect for Leaks in the Ink Path ( Page 49 ) 4. Nozzle Check ( Page 51 ) 3. Inspect the Open Cover Detection ( Page 50 ) 5. Head Cleaning ( Page 54 ) 31