EPSON — Workflow

Workflow before Beginning Work Workflow before Beginning Work This section describes the items to be checked before beginning work. Workflow Operations and Check Items for Rear Side 2. Removing the Stopper Pin of the Pressure Roller ( Page 64 ) 1. Checking the Air Pressure ( Page 63 ) 3. Lowering the Towel Roller ( Page 65 ) Operations and Check Items for Front Side 1. Supply Water to and Check the Belt Cleaning Unit ( Page 67 ) 2. Check the Amount of Waste Ink Remaining in the Waste Ink Tank ( Page 68 ) Other 1. Prepare the Fabric ( Page 69 ) 2. Adjusting the Fabric Peeling Prevention Bar ( Page 70 ) 3. Checking Operating Parts ( Page 74 ) 4.

Checking the Exhaust Equipment ( Page 75 ) Procedure for Turning on the Power 1. Pushing an Emergency Stop Button for an Emergency Stop ( Page 76 ) 2. Turning On the Power ( Page 76 ) 3. Starting Leonardo ( Page 77 ) 4. Releasing an Emergency Stop Button ( Page 78 ) 5. Executing Set Point ( Page 79 ) Operations and Check Items After Turning on the Power 1. Check the Operation of the Emergency Stop Equipment ( Page 80 ) 2. Inspect for Leaks in the Ink Path ( Page 81 ) 4. Nozzle Check ( Page 84 ) 3. Inspect the Open Cover Detection ( Page 83 ) 5. Head Cleaning ( Page 87 ) 62