Before you start 2.2 Average task duration Hardware: 10 minutes The average task duration including preliminary and concluding steps is indicated at the beginning of each procedure next to the procedure class. The following table gives an overview of steps taken into account for calculating the average task duration. Table 1: Calculation of the average task duration 30 Upgrade and Maintenance Manual RX2530 M4 Step included Explanation Server shutdown no Shutdown time depends on hardware and software configuration and may vary significantly. Software tasks necessary before maintenance, see section "Starting the maintenance task" on page 77.
Rack removal, disassembly yes Making the server available, removing the server from the rack (if applicable) Transport no Transporting the server to the service table (where required) depends on local customer conditions. Maintenance procedures yes Maintenance procedures including preliminary and concluding software tasks Transport no Returning the server to its installation site (where required) depends on local customer conditions. Assembly, rack installation yes Reassembling the server, installing the server in the rack (if applicable) Starting up no Booting time depends on hardware and software configuration and may vary significantly.