U.S. Army Material Command (AMC) AMCP 706-210 — FUZES - Engineering Design Handbook AMCP 706-210 (U.S. Army) PDF Download

Downloaded from https://www.everyspec.com BLEEpS OSCILLATOR INPUTS "*i ** * COMMON, INPUT = -- ASSEMBLY Figure 8-7. Flueric kelaxationw Ocillator-and Digital Amplifier devices are 1/2 to 20 psi, rather sophisticated, assembly; Which provides for. an- arming'delay pressure regulating equipmeit Would. then be after-firing. The delay, 1-1/ 2,to 6 sec, is achieved -required. by an external bleed dashpot 1 ' . The fuze is One of the more promising possibilities for shown in Fig. 8:81 . After the setback-pin (not military applications, is to-make use of ramair shown in-this view) has moved rearward and the. after the projectile starts moving.

This source of bore-riding pin (G),has been ejected, the slider (F) energy will be widely used Withir the atmosphere is driven into the armed position by a muaic-wire oniprojectiles with velocities in excess of 400 ft. spring. However; slider motion is-retarded bythe per sec. pap assembly.. This assembl, conists,. of -alUmi- Table 8-1 " compares -the fluidic approach num cap (R), aluminum plug P),and a sintered with the other,, logic ,and control ,techniques. monel alloy restricter,(T). A rubber 0-ring,(U) Problems still remain.

in fluid systehs,, but the isfitted on the slider'to provide a seal so, that air promises- of -flueric - systens-appear-toodtweigh can, pass -- only-,through-the--restricter. -A--plastic their prdblems and to offer an effective timing disk covered with pressure-sensitive tape (V) pro- and control mechanism for, fuze. application. tects the restricter during shipping. The present design was empirically developed 8:2.3 PNEUMATIC DELAY for interim-use'due to the need of mortar fuzes- with a delay function to provide forthe safety of Arming delays can be achieved using the'prin- mortar crews. Additional developmental work-is cipleof a fluid dashpot.

Industrial dashpots-often required,to improve its storage, and temperature , ,use oil in a piston-cylinder arrangement where characteristics. the oil is bled through-a small orifice or through a~porous member. Oil dashpot uhits-cannot be 8.2.3.2 Annular Orifice Dashpot applied to fuzes because of leakage problems, and variatibns 'in time with temperature. When An' annular orifice dashpot is shown, in Fig. air is the fluid, leakage is eliminated, and vis- 8.91 3. The "orifice" isthe minute clearance be- -cosity changes can be minimized 'by various de- tween pistontand cylinder. By selecting materials sign features.

for piston and cylinder having different thermal coefficients of expansion, the orifice will change 8-2.3.1 External Bleed Dashpot withtemperature, thus affording a means of ap- proaching a donstant flow in spite of air viscosity Fuze, XM717 is one of a family of single- changes with temperature' A . A glass cylinder can action, superquick mortar fuzes that has a stider be accurately produced- and the piston can -be ,; 8 -7