U.S. Army Material Command (AMC) AMCP 706-210 — FUZES - Engineering Design Handbook AMCP 706-210 (U.S. Army) PDF Download

Downloaded from https://www.everyspec.com AMCP 706-210 acting, on the fuze, selects materials, anJ de- nents- to the required setback and centrifugal termines componeftt sizes. External, forces to forces. Model t,,sfs of-partial assemblies and sub- which a fuz e may besubjected are shodks aid vi- -assemblies in the earlystages of development Mll bfations that ocdurlvhen a fuze is transported or often reveal' flaws that.are not evident on the whien accidentally dropped. Accelerating forces drawing board.

on different fuze parts ocicur during launching Model tests at each stage and detailed layouts (setback), during flight (centrifugal and creep), of the design are important for the successful de- and, at the :tLrget (iriipact).. All these >forces the Velopment of .a fuze. They ,permit early.evalua- fuze must-be able to withstand without changing tion-and revisioi of comppnent parts before the its operating characteristics. Forces nust bd con- design has progressed to the advanced stages. It puted in detail.

'Finally,-the choiceoof materials is possible that a change in one component might and dimensions for the parts depend- on elastic precipitate ,a series of changes -in other compo- modulus, strength, corrosion resistancei machin- nents that are already being fabricated in, the ability, availability in. timeg of emergency, and model shop. cost., During this phase, performiance is calcu- lated and reliability is estimated. 9-3.4 FINAL ACCEPTANCE, SAFETY, AND PROV. Secondary effects thiit might necessitate a ING GROUN6 TESTS change in shape or *balancing of parts are reso- nant -vibration frequencies, Coriolis effects, -and overweight.

Those who are familiar with-hand- A, fuze that haspassed all of the preliminary ing, storage, and tactical requirements may sug- model tests satisfactorily is ready for rigorous gest other changes. safety and surveillance tests and for proving The final drawing-board layout should include gound acceptance tests. These are genera,yper- different views, so that interferences may-be de- 'formed on samples selected from a pilot lot,, a. tected'and the orrect iotion of every part may thus are nearly re reseittive of' lhioduction be assured. The failure to make such checks is quality. The safety and surveillance tests are often responsible for costly delays in the modeL describedin pars.

15-3 and 15-4. shop, and -in scheduling, proof tests. See also The only completely reliable test for the effec- Chapter 14 for additional guidance on design tiveness,,of, a- ftuze is the firing or proof test that details, is made under actual conditions of use Thefuze, if t functiois, is destioyed; henie, design fea- .9-3.3 MODEL TESTS-AND REVISI6N S tures must be judged good'or bad'by the applica- tion of statistical analysis. The- evaluation of a The complexity of forces acting and the strin- proof test ,is extremely important. Sometimes gentrequirements imposed on a fuze.emphasize -the -results are surprising and perhaps- discourag- the need for extensive tests after-the prototype ing.

Accumulated tolerances and conpromises or modei has been fabricated. The actual'sdhedule by designers of other components-of the weapon used and the number of items tested for evalu- system (projectile, gun chamber, and propellant) atingia fuze design depend on the type of fuze, cause the operating conditions to differ 'from severity of requirements, available time and those on which the fuze designe "basedhivcalcu- funds, and related factors. On one hand, the lations and. thus can cause -malfunctions, This evaluation must be reliable.

On the other hand, should encourage the fuze designer.to learn m ore it must be realistic, must permit design revisions about the complete weapon system and to main- at various stages of testing, and must allow short tain clos6 liaison with the designers of the Other cuts when indicateo by the particular iipplica- major components to arrive ata well integrated tion. The tests are described in more detail in system. Chapter 15 on Fuze Testing.

The prooftest may indicate the need for basic While most tasts are performed on the corn- modifications to the fuze or an area for compro- plete assembly of the prototyp fuze, model testg mises so that the fuze can be used throughout an during the preliminary layout stage can be most ammunition series. -Likewise, the pilot plantpro- helpful and may save many headaches. For in- duction run may suggest other refinements to en- stance, a novel idea for an arming action could be hance the ease of manufacture. These changes evaluated, by ;ubjecting the pertinent compo- must be made and evahiated'by additional model 9,-4