Downloaded from https://www.everyspec.com AMCP 766210 selected',a -7/16 in. in diameter 'and 5/32 in. Table 9-2lists the various inomentsof inertia thick inorderto properlyhouse the-detonator. for the ,rotor and its parts as caculated by the -Rotor-'material is selected on the basis of den- usual' formulas. By using Eq.'6-46,with 0o =, 55' sity, confinement, and safety. An alunihium alloy and 0' = 0, the-time'to arm at the spin fors-the that can be die cast would be convenient. muzzle velocity (Table 9-1) is found-to be about Next, the designer deteimines the arming, 3 mnsec. Since' the friction. present,,always de- limiti.
While in theory a fuzefanns,at a certain creases the- velocity as evident in Eq., 6-47, the instant, in prctice, allowances-must bemade'for time to arm 'will be greater than- 3 insec. While dimensional tolerances-and variations in friction, the lead, weights decrease the arming-time, they Hence, both mininum -aid -maximum.,aminng also increase the stability- of the rbtr 'in the limits must be selected. The specified armig' airmed' position which increases~the reliIability of levels are converted into units' applicable to the the fuze 'to initiate the bursting charge., particular design, such as setback or spin levels.
TIO restraih the disk in the unarmed' position, The minimum arming level (must-not-arnivalue)' detents are inserted that are held by springs. must be sufficiently high to assure'safety during, If friction between detent and rotor h'le iscon- handling and testing. The maximum arming sidered negligible; these spriigs are set with an level (mist-arm valu6) must be well Within the initial compression equivalent to the centrifugal ,capability of the weapon and must fulfilL the force produced by the detentsat the minimum stated, requirement. The spread between these spin to arm.
At the latter spin rate the detents ,two valuls must'be reasonable from a viewpoint will 'be in equilibrium while at any higher spin 'of manufacturing toleraices. Experience dictates rate they will' move radially outward to release which of the many values,that meet thesebiaada the rotor. Eq. 6-17 ,definas, the motion for the limits are optimum. detents. Twoitems are important: (1)'the spring For the sample prdjectile,,the spin at the'muz- force increases, as the spring'is compressed, but zle isifound from Fg. 5-5 as 730rps or 44,000 the centrifugal 'force increaes at the same'rate; rpm.
Reasonable arming limits, based on -the therefore, once the part moves it will continue, above considerations, would be 12,000. and to move'radialiy outward; and (2) the frictional 20,000 rpm.. forces arise from the torque induced in the rotor. With the equations in pg. 6-5.1, the time tO The resisting, torque on the rotor is represented arm (the ,timed for the 'rotor to, turninto the by the second ,term on the'left-hand side of Eq. 'aligned position) is calculated. For a first approx- 6-45. From the 'vwtie of the disk assembly' in, Imation Eq.
6-46 may be solved for t by neglect- Table 9-2, the torque is found'tobe3.72 x 10 " 3 ing -frictiph., This value should-be the miniffium lb-ft and the frictional force on ,each detent is arming-time. 015 lb. The centrifugal force on the detent, Note. from 'Eq. 6-46 that the time to arm de- weight 4 giains, 'is calculated' from Eq. 5-11 as pehds only upon the ratio of ,the ,moments of 0.37 lb., The initialsspring load, according to Eq. inertia of,thedisk. However, densityis not an ig- 6-17' must be atleast 0.22 lb to prevent arming norable factor. Th'e individual moments of inertia below the spin of 12,00 rpm.The spring design depend upon density of rotor and its cpmp6nents.
is explained in p4r. 10-.., TABLE 9-2. COMPUTATIONS OFMOMENTS OF INERTIA, Slug-F? 2 Solid disk 1.1-74'x 10 " 8 " 1.042 x 10 " 8 1.042 x 10 " 0 x 10-1 Hole for lead 0.078 0.082 0.0092' 0.0,73 Hole for detonator 0.151 0.014 0.151 -0.137 Hole for detent 0.0046 0.0032 0.0019 0.0013 Disk 0.830 0.836 1 0.858 -0.022 Detonator -0.0954 0.0106 0.0954 -0*0848 Lead weights 0.322 0.340 0.038 0.302 'Disk assembly 1.569 1.527 1.029 0.498