Downloaded from https://www.everyspec.com rotor to rotate -un til the detonator contact is, 0;k_ against the stop, and-the detonator is 'aligned 'with the lead cup.'Ih-this position, the detonator *Alng makes electrical coninection' with the contact' 2DHNW 'leaf, 'Electrical, ener~gy, transmitted from the HA C006IR AN 141iti nose~element upon imnpact or graze' initiates 'thie ,detonator that'propogates through theexplosive \M The retu'rn' a ,Will return the rotor in the PIPN o SUPO I - ,eetthat- the fuze does not function if the spin m~ n -drops below 20100'rpm . This'insures against firing' \Iw \COSS SAN 131 of a pieaimed'fuze .and provides for safe disp'osal and handling, of.
spe'nt projectilebs that were ~not desr~yd b 'tr~zt ioac. igur(e 9-9. Head Assembly -for Fuze, M557A JE 1 -d e s r~ y d b y t ar et i ii ~ ct .(R a in In se n s itiv e ) .9,4 4 4 lxa ppi of ain t n e~sti~ D e igndrops 4 m m and larger in diam eter and reduce Am effective empirical rain d'esensitizing fca- their momentum,to a level siafficiently-'bel6W'the ture for point-detonating fuzes, consistsof a re- threshold energy for initiation. Four drain holes, cessed cavity in front of thie superquick eblement spaced equally around the base of the cavity, (which consists of'-firing pin, firing-pin support expel by centrifuge action any -accumulation of cup and a d~tonator) as shown in 'Fig. 9-9.
The water. head, assembly is the one used 'to make Fuze, This type, ofhead is also effective in desensitiz- M557A1E1 rain insensitive. The cavity dimenh- ing fuzes for more effective penetration of jungle sions can be varied' so~as not to seriously ~affec. canopy. In this type of environment, the bars finctioning against norialArgets.. Dimensions and. the re 'cess -serve to, cup up, all foilage, of the cavity illustrated are 1/2 in. diameter and branches, etch, encountered, filling the cavity 3/4 in.'deep. The recess is baffled by three cross -while providing a delay benpeath the canopy. bars of different depths and -oribntatiomsdn the, When the cavity is -completely filled, the fuze holder.
These bars effectively break-up rain functiois~ in the regular, impact uode. REFERENCES a-t Lettered References -are listed at 11he end of Safety Criteria 'For, Dept. of Defense, 16 this handbook. June 1967. 5. MlL.25A, Ammunition and SPecial~ffcaponsI i. AR' 70-38, Research, Devclopment, Test and, General Instructions For, Dept. of, Defense, 15 Evaluation of Materiel for Extreme Climatic De~ember 1961, Paragraph 4.8. Conditions, July 1969, 6. -R. L. Graumann, History of Design and De- 2. A. W. Baldwin, Humidity as a Factor in Fuze velopment' ofiMk 27 PI) Fuze, Naval Ordnance Design and Evaluation, Journal Article 26.0 Laboratories, White -.
Oak, Md., Memorandum of the JANAF Fuze Committee, I Feb-uary 7868, 5 September .1945. 1963, AD-296 582. 7. F.'Spinale, Fuae PIBD, X31539 Series and Sup- 3. USAMUCOM Regulation 705.11, Research and ply, Control Power, X3122 Series' ('U), Hesse. Development of Materiel, Fuze Design, 11 'Eastern'Div., 'Everett, Moss., Final Summary June 1964. Report, 14 February 1966, Contract DA-19.020. 4. MIL.STD-1316 (Navy), F;Aes, Navy, Design ORD-5442 (Confidential). 9.12