po ^ .7 - - ' . ..- Downloaded from https://www.everyspec.com ACIP706.210 must rotate to index 'a notch, in it with -the The mass,, 6.34 x i0 . 7 slug, is calculated from a g stem (8). The stem themmoves.forwArd volume and density; the spring constant,, 6.43 ahd allows the slider (9) to move by sping action in.-lb, is obtained from-Table6-1; and.by letting ,bringnthe'primer,(10) into line with the-firing S'be 0.55,in,, one-half the maximum.tr vel (the p- andthe rest of the explosive-train. A spring same- as x), the time-is.found to be -4.5 ifisec. loaded detent (11),thendrops into a hole in the This 'short time mayobe neglected. Even, With-a 'slider and holds-itin the aimed-position.
'friction force .of 1 ,b, the-time is only extended (b), FuNCTIONINGIS ACCOMPLISHED to .6-mse. For all wpractical..purposes then, the AS'FOLLOWS: Ejection of the- ariing, pin re- time- to eject the arming pin may be neglecled moves a~prjectiononit "from, a slot in theDisk in coniputing the ain- ing delay. __ A'bl9,,T5.('12)' '7a11owing the m'ei&'t Itart. Staiti g isassuyd by a spring-loaded wm- 12-4.3 THE PRoPELLER ber (nitsh1wn) which sweeps across the escape whelimpating -motion to-it. The timing disk The propeller has twovanes which act like the levejr(13) ridsthe periphery of'the disk assembly blades of a windmillas shown, on Fig, 12-8.
They until tiie nbtch iiithe disk.from'which' e arming pin was ejected indexes with the lever The sprihg -_ loaded lever thendrops into theslot-releasing 0.090 sytem.of lgeis.which intumreleagsesthe spring- liaded' retainer firihg.pini spring (4).This retainer then drives the firing pin into the priinerfiring - the fuze. The functioning delay.is dbtermihed by 0.16 the, ar through which the Disk Assembly, T5. ,must-.-r6tate. before the system, of levers, is ac- _ o The functioning, delay may.-.be set in 0.5 sec 'intervals between 4 and' 91 sec. This is accom- ,puished by rotating the head and bearing housing o.1 "- assembly relative to-thelbody assembly.
'The arm- ing delay is automatically~set at about half the functioning, delay.PRING PI N 12-4:2 THE ARMING PIN The arming pin must be.removed before the disk assembly can turn. Fig.12-9 shows the-de- tails of the arming pin assembly. The arming pin is held ,by a cotter -pin, during shipment and in- stallation in the bomb rack. The initial spring load on the cotter pin-6an be calculated, from the equation for a helical spring given-in Table 6-1 and by using Fig. 12-9; it is'found to be 3:53lb. COTTER PIN 7 - The shear stess on thepin is then 580 psi which 0'oi2 .610 is well within normal limits. Compuiation of time to airis based on Eq.
6-3 without friction or'on Eq.,6-6 with friction.- Ifone assumes negligible friction, the minimum 0 -j-"- .30 2 time, t for the arming pin-to move a distance Sis 0.0478 then obtained'(see-pars. 6-2.2,2 and 6-2.2;3 for 0.350 terms) NOTE.- ALL DiIVIENSIPNS IN INCHES t, os" k (12-3) Figure 12-9. Arming Pin Assembly of Fuze, M198 1210 4,q