Downloaded from https://www.everyspec.com -AMCP 70W210; cap. Withdrawal of the firing-pin fromi its posi -nismh that provides a delay of 0.8 to.1.3-sec, at tion against the side of,'th6 rotor permnits the which time the stab detonator is in line with-ithe spring-loaded rotor to-turn. However, rotation- firing, pin. The, explosive trainconisists of:-deto>- of the -rotor is slowed- down. by- it delay rnebha- nator, lead, booster pellet, and'shaped charge. REFERENC-ES a-t Lettered references are'listed atthe,end of this 4. TB 9-1980-1, Fuze, 'Bomb: 'Nose,, M90T Series; handbook. Fuze, Bomb: T'ail M1905;Fuze, Bomb:Th ii, M906; 1. fM'9-1i285a00, -,Bombs and Bomb Comnponents, 'Fuze, Bomb:
317- M907, M008, M1909 aind Delay Dept. of Army, April 1966. Elements M9, 7-7E3;,and T6E4: Description and 2. Fazing Systems for AIir Launched, Weapons i(U);, Use,, Dept.,ofArmy, February 1966. Joint Technical CoordinatiA 'Group -for Air 5. G. Birk-off, Dra~g of Projectilles Without Ylaw, Launched Non-Nucleur Ordnance, JTCG-ALMNO, U.S. Army-Ballistic Reseorch. Laboratories, Re- issued by the Naval Air Syst ems Command,, port 422, Aberdeen Proving Ground; Md., 300c. Washington, DCC., 1966.,(Confidentaio). tobel 1943. I3 Marvin 'Kospei, and Arthur Wrenn, '1lK 81 and 6. J. J. Gehrig, Lethal Areas of Some .Ffagmenta- M1K 82 Bomb Reljease Curves, UflS. Naval Ord- tion, Weapons, U.S.
Army, Ballistic Rsac nonce Laboratory, White Oakr Md., Technical, Laboratories, Report '717, Aberde en Proving, Report 65-230, 20 May 1966. Ground, Md., September, 1953. 12-14-