U.S. Army Material Command (AMC) AMCP 706-210 — FUZES - Engineering Design Handbook AMCP 706-210 (U.S. Army) PDF Download

Downloaded from https://www.everyspec.com AMCP,706-210' _ - - , (6) Lubicating oils -(7) Organic dyes present in anodized prdte- . 'When contamination-particle 6r organic:fili.- occursi the following steps hould be taken: .(1), Determine -if 'the.,contact .requirements. are realistic. (2) -Pet" ne 4f wipig -actio,-Andcontctr - -. psi~fesf'canbeincre-asedd without adversely af-, (3)- Make an initial, simple chemical analysis" test Of contaminant. fecting,theoperatioWof thb.d&Vice: (4) Determine if- the contamination p6blem-"" is of a particle -nature, organic film nature, or bot.

Smeof hemethods 'for analysis, are, solubility testsi, spectrographic -analysis, chem- ica spot'tests, micoscoo0py,. electron, diffraction, X-ray diffraction, radio- active tricers, infrared' spectroseopy, and plastic replica,. (5) Take appropriate st psto eliniinate.the 'contamination by acomplete materials review of. . - -metals, insulators, and gases used, an -inispction of the manufacturer's-quality control and clean- Figre 14-1. Packing BOx' and Fuz. Supports ,ing techniques, ind _an inspection of the.,Validity of test results for thehermnetic seals.

14-4 LINKAGE OF, SETTER COMPONENTS 14-3 PACKAGING Designs of mechanical setter devices should Safety in transportion and storage depends include consideration Of the linkage of thesetter to a large degree on-how the fuze i packaged. Al- components and ,setter display components in though:speifications and packaging designs have conjunction, With the device being ,et. ,been standardized, the desiginr sldibe fa- 'The-,PaMalal-mechanicallinkage-(Fig 1-4-2(A)), miliar with',the v'ious -levels of shipment as they permiti ' concurrent positoning of setter displiy might ,afect his design. A Packaging handbook components-and the item to be set.This tpe of should be consuled 3 .

linkage, could cause the display of a false reading 'Forthe most-part,, the packaging of fuzes has because- the setter display does pot hecessarily' 'n-rita hdardized 4 .For 6verseas shipment (Level 'have to, agree vith, the information actually set A), 8 artillery or 10 rocket fuzes are-packaged in into item,(thelinkageto 6itherthesetter dipiiay a, Water-vaporpioof, rectangular, quick-opening componentsor item being set could be faulty). type, metal boxhaving polystyrene supports to The series linkage (Fig. 14-2(B)) is little improve-, contain the fuzes ('Fig. 14-1). Two metal boxes ment rover the'first because the linkage to the are -overpacked with a wooden wirebound box.

item to be set could be deficient even though a Forlong term storage (Level B), 36 metal boxes setting is displayed. -Deficisricies are more prone of packaged fuzes are placed in apaIllet type'box, to occur inthe high-torque gea trains of the item For interplant shipment (Level-C), theassembled to be set rather than in the low-torque gear trains or partially asseibled fuzes are packaged' in a of the setter display asseinbly -(the, linkage, be. fiberboard carton utilizing the same polystyrene tween,-the two could shear. The,most ieliable- supports used in the -metal boxes. The rocket and safest linkage (at io increased' costs) -is a fuzes areplaced in a carton having.

an,-eggcrate ,diffrefnt series linkage (Fig. 14-2(C)):in -which type separator. The cartons are overpacked with -the 'setting actually positioned' into, item being an inexpensive-wooden wireboundbox. set is displayed after the fact of ictual'setting. 14-2 i