Downloaded from https://www.everyspec.com -, AMCP 70&210 'ransduces in the device being tested convert the vriable being measured into an electrical sig- nat- that- is subsequently used o moduila the ciarier of an RFItransmitter., Modulation ,in- es changing the amplitude, frequency, or " ' , phase of-the carrier. The signal is received, ampli- fied, and', demodulated on" the ground and"re- -vo corded on, magnetic -Op-0or o0fian, 06igraph I f for subsequent afialysis. If developmenttests appea i to warrant tele- ,met ring, its well'to sek'guidance from soime- one& 0 famfiliar-with equipment and facilities ,f the TONtest areabing considered foi use.
ti 7 15-2.3.3 Power Sources :Power sources require special ,tests only occa- 4 sionallyV.iWheh the source-is a'mechanical.trans- ducer, such as a spring or arotor,jit is tested like - any other mechafical device.-Hydraulic sources .may require pr6sure tanks or windf unnels if the Figure 15.3. Shock Mach'ine medium is aii-oragas ;Elecic sources, as wellas, auxiliary electric circuit components, are tested conitains the parachute aid deployment-mecha- as breadboard models in conventional ways. In nism.
in addition to the fuze component under all instances, the final test must establish that the test.emrin in the base o vethe source can, set off the-primer, or detona- STelemetering i thebroad sensei i t tor,, in the particular fuze. transmissio n,,of data by any meahs from a re- mote and usually inaccessible point to, an access- 15-2.4 PROOF TESTS ible location 2 . Usually, :telemetering refers to electrical, means of acquiring, and transmitting The performance ofa. final design for afuze, transmission usualy being accomplished is evaluated ,by actually firing a' complete r6und zbyzmeansof ahRF--link from, themunitionto a containingthenew- fuze; - this: is-.called -a-proof - ground station.
The requirement for telemetering test. Firing tests die not only a powerful'check - " " data from fuzes'-may be quite severe, as in-the *on the validityof simulated tests, but they also artillery fuze where survival of the telemetering permit a checkon .perfonnance of the complete transmitter, power source, and antenna is essen- fuze' when subjected to the total environment tial under -accelerations, in excess of 50,000 g that it willexperience. Theproof test is the only during setback. A tylical system.meeting these means of evaluating final assembly operations requirements is shown in Fig. 15.4'. On the other and.
possible effects of force combinations that hand, the tel, metering equipment in rockets, were not apparent when individual components 'bombs, andgrenades neednot be'as rugged al- were subjected to single forces one 'it a time. though size and weight might be critical. Table '15-3 enumerates the type of information, Often in military applications, a simple yes or that can be determined by proof tests.. ,no responswill provide answcrs that will-isolate Proof tests have not~been standardized to the troublesome portions of the fuze in development -same extent as other tests because they must be: programs.
Simple modifications of the munition, adapted to individual, requirements, that ,ary may give a light"flash or a puff of'smoke that can -widely., It is, therefore, not possible to describe be detected by a human observer or by a de- individual tasts in detail. Test conditions, equip- tecting device. However, Zor variable data such ment, quantities, and 'methods of analyzing re- as acceleration, strain in a member,,or rotorposi- suits differ from fuzet fuze. tion,-conventiohial RF telemetering is necessary. The basic.condept of the proof test is: A fuze I15- C l-