HP — Connecting the system

Setup Connecting the system Make sure the following preparations of the physical site are met: • The system must be placed on a flat and stable surface able to support 36 kg (80 lbs.) to avoid the risk of falling. • The work area for unpacking the system should be 76.2 cm (30 in.) high, 76.39 cm (28.5 in.) wide and 69.95 cm (27 in.) deep. • The system must be located at least 20 cm (8 in.) higher than the waste- water drain. • The drain facility must accept a drain pH level between 6.5 and 10.0. • The drain must accept a wastewater temperature of at least 75°C (167°F). • The water source connection must have a 3/4 in. hose thread. • The water source temperature must be ≥15°C (59°F).

A hot water connection is highly recommended to speed up heating, but is not required. • The water pressure must be between 0.5 bars and 10 bars (7.25 psi and 145 psi). • The water source hardness should be ≤300 ppm. • The grounded electrical outlet (220–240V~ 9A 50 Hz 1200W) must con- nect to either a Euro or a UK power cord plug provided and must be located within 2 m (5 ft.) of the system. • The operating environmental temperature must be between 15°C to 30°C (59°F to 86°F). • The operating environmental humidity must be between 20% to 80%, non condensing. • Consult your area's requirements regarding the disposal of the HP Designjet 3D Removal System effluent prior to use.

A permit or form of pre-treatment may be required in your area. 9