HP — Installing the Z stage

39. Move the dial indicator to the front left of the Z stage and zero the dial indicator. 40. Using the XY guide rod leveling fixture, adjust the rod up or down until the dial indicator reads the value the calculator has given. See Figure 274. Figure 318: XY guide rod leveling fixture 41. Using a 5 ⁄ 32 ” allen wrench, securely fasten the front left Y guide rod mounting screw. 42. Move the dial indicator to the front right of the Z stage and zero the dial indicator. 43. Using the XY guide rod leveling fixture, adjust the rod up or down until the dial indicator reads the value the calculator has given. 44.

Using a 5 ⁄ 32 ” allen wrench, securely fasten the front right Y guide rod mounting screw. 45. Move the dial indicator to the rear right of the Z stage and zero the dial indicator. 46. Using the XY guide rod leveling fixture, adjust the rod up or down until the dial indicator reads the value the calculator has given. 47. Using a 5 ⁄ 32 ” allen wrench, securely fasten the rear right Y guide rod mounting screw. 48. Repeat steps 53- 66 until the XY table is completely level. 49. Remove the XY guide rod alignment brackets. 50. Remove the XY table leveling bracket and dial indicator. 51. Reinstall the electronics bay. See “Installing the electronics bay” on page 176 52. Reinstall the side panels.

See “Installing the side panels” on page 164 53. Reinstall the top panel. See “Installing the top panel” on page 162 54. Power the printer up. 55. From the display panel, press Maintenance > Machine > Tips. 56. Press Z Calibration to run the automated Z calibration process. -335