Format: ZTESTo Zo Where 0 is one of the following: o Test o - Hardware Integrity Test 1 - Analog Loop Back Test Purpose: Places the modem in the test mode specified by the argument. For modes other than the integrity test, the modem stays in the test mode until any other command is received. For the integrity test, the test is performed, status posted, and then the modem returns to service immediately. The integrity test takes eight to 10 seconds to execute and its completion is signaled by an "OK" message. All commands following the ZTEST command in a single command-line are ignored. 3-58 Internal Modem