ISPSoft User Manual Multiple nodes Upload all Ether Link setting parameters on nodes; before uploading, please check the system and hosts or modules are well-connected. Method 1 Click the PLC menu, point to Transfer , and click Upload (Multiple PLCs) . The users can also download the related parameters by clicking on the toolbar. Method 2 Select All Nodes on the node list, right-click All Nodes , and click Upload (Multiple PLCs) on the context menu. Additional remark After re-uploading Ether Link parameters, if nodes that are not assigned in NWCONFIG, the node will be framed in red to display as Asynchronous Device .
When Ether Link setting contains asynchronous device, monitoring or down loading are not allowed. 20-72