L-4733A/L-4733AW Operation Guide Maintenance (4) Tighten the screws (2 positions) on the substrate guide. (5) Feed the substrate through the rollers on the Rewinder. (6) Place a paper core on the Rewinder. (7) Place the front substrate guide against the front frame, and slide it onto the shafts on the right and left sides, in that order. 263