Downloaded from https://www.everyspec.com MIL-STD-100E INTERIM NOTICE l(AR) 3.54 Nuclear Hardness Critical Process (HCP). A Nuclear HCP is any fabrication, manufacturing. assembly, installation, maintenance and repair, or other process or procedure which implement a hardness design feature and satisfies system hardness requirements. 3.55 observable Critical Item (OCI). An OCI is any part or material specifically designed. selected or qualified to meet specified observable requirements. 3.56 observable Critical Process (OCP). An OCP is any fabrication, manufacturing, assembly, installation, maintenance and repair.
or other process or procedure which implements an observable design and satisfies observable system requirements. 3.57 Original. The current design activity’s full size reproducible drawing or digital data tile(s) on which is kept the revision record recognized us official. 3.60 Part. One piece, or two or more pieces joined together, which are not normally subject to disassembly without destruction or impairment of designed use. (Examplus: transistor, composition resistor, screw, gear, transformer. milling cutter, bearing.) See 3.7.1. 3.61 Part or Identifying Number (PIN).
The identifier assigned by the responsible design activity or by the controlling nationally recognized standard which uniquely identifies (relative to that design activity) a specific item. The PIN generally includes the controlling drawing or document number and optional suffix. The PIN does not include the drawing revision identifier. drawing size. or CAGE Code. The term “part or identifying number” replaces the terms “part number” and “bulk material identification number”. (ASME Y14.24M and MIL-STD-96l) 24 Supersedes page 24 of 30 September 1991