Department of Defense MIL-STD-1311D — MIL-STD-1311D Test Methods for Electron Tubes — DoD Standard Manual PDF

Downloaded from https://www.everyspec.com MIL-STD-1311D METHOD 3256 ANODE DELAY TIME These tests are measurements of the time interval anode delay time (tad) between the 25-percent point on the rising portion of the unloaded grid pulse and the point where anode conduction takes place as shown on figure 3256-1. In multigrid tubes, the reference grid shall be that which receives the last pulse. 1. Anode delay time. The tad measurement shall be made at the end of the specified period of operation. If a measurement of anode delay time drift is also required, operation of TUT shall be continued. 2. Anode delay time drift.

This test is a measurement of the change in anode delay time caused by continued operation of the tube. a. After completion of the initial tad reading, continue the tube in operation under the same conditions. b. After a specified time duration (measured from beginning of the tad measurement), make another measurement of the tad. c. The difference between the initial and second tad readings is the tad and shall not exceed the specified maximum value. FIGURE 3256-1. Grid pulse (anode conducting). METHOD 3256 3256-1 19 April 1968