Downloaded from https://www.everyspec.com MIL-STD-705C c. Expose the set to the salt fog for the period of time specified in the procurement document and record all chamber conditions before, after, and at the end of each 24 hour exposure period. After exposure, remove the set from the chamber and remove any salt. deposits resulting from the exposure. Thoroughly examine the set and all its components for evidence of excessive corrosion and salt damage. Record the location(s) of any corrosion or damage found. Perform method 608.1, Frequency and Voltage Regulation, Stability and Transient Response Test (Short Term). Record any operating malfunction. d. e. 711.5.4 Results.
Compare the results obtained with the procurement document requirements. 711.5.5 Procurement document requirements. The following items must be specified in the individual procurement document: a. Temperature condition of the salt fog exposure. b. Relative humidity of the salt fog exposure. c. Chemical content of the salt used during this method. d. Amount of salt in solution. e. Specific gravity of salt solution. f. pH of salt solution. g. Number of hours of exposure to salt fog. h. Degree or amount of permissible corrosive action. i. The voltage requirements specified in paragraph 608.1.5a of method 608.1. j. The frequency requirements specified in paragraph 608.1.5b of method 608.1. k.
Voltage connection and frequency at which this method is to be performed. Method 711.5b 3