U.S. Department of Defense MIL-STD-810C — MIL-STD-810C Environmental Test Methods Standard — PDF Manual Download

I Downloaded from https://www.everyspec.com MIL-STD-81OC t 7. EXAMPLES. The following examples are provided to facilitate the synthesis of the test spectrum for a number of typical cases ranging from equipments located on primary structure to those equipments associated with secondary structure. 7.1 An aerial refueling unit weighing 75 pounds is located in the nose section of the A-10 aircraft. The GAU/8, a 30 mm cannon is to be used and the firing rate (r) is to be 70 rounds/see. The unit inserts into the aircraft flush with the skin and is bolted directly to the primary structure. The D vector is 48 inches and Rs = O. 7.1.1 Determination of Gos and Gor.

From 3.3.1 select equation (1) or (la). G = rs E/E r/r n/ 0s 0 n 0 0 rs = 2000 g2 E/E = 4.13 (see table 519.2-IB) o T/r = 70/100 = .7 0 n/n =1/1=1 0 G = 2000 g2(4.13)(.7)(1)(1)= 5782 g2 0s select equation (2) or (2a) G = rr E/E r/r n/ or n 0 0 0 rr . 3S g2/Hz G = 35 g2/Hz (4.13)(.7)(1)(1) = 101.19 g2/Hz or 7.1.1.1 Test level reduction, Ah, of Gos and Go= due to gun standoff parameter (h/c). Owing to the gun configuration of this aircraft (see figure 519.2-5 and 519.2-6), Ah = O d8. METHOD 519.2 519.2-14