Downloaded from https://www.everyspec.com MIL-STD-81OC 3.1.7 Inspection. At the end of the incubation period, the test item shall be removed from the test chamber and inspected in accordance with General Requirements, 3.2, except for hermetically sealed equipment, the equipment enclosure shall be opened and the interior examined for evidence of fungus growth or damage. The test item shall be operated when specified in the equipment specification and the results obtained in accordance with General Requirements, 3.2. NOTE: Conductive solutions used as a spore media and growth acceleratormay affect operational tests. 4.
SOMFIARY.’ The following details shall be as specified in the equipment spec-on: a. Pretest data required b. Failure criteria c. Test period if other than 28 days (see 3.1.6 c) d. Whether test item shall be operated (see 3.1.7). S08.1-5 METHOD 508.1