EPSON — Workflow

Workflow before Beginning Work Workflow before Beginning Work This section describes the items to be checked before beginning work. Workflow Operations and Check Items for Rear Side 1. Supplying and Adjusting Compressed Air ( Page 29 ) 2. Removing the Stopper Pin of the Pressure Roller ( Page 31 ) 3. Lowering the Towel Roller ( Page 32 ) Workflow for Front Side 1. Supplying Water to the Belt Cleaning Unit ( Page 34 ) 2. Check the Amount of Waste Ink Remaining in the Waste Ink Tank (for Models with Waste Ink Tanks) ( Page 35 ) Other 1. Checking Operating Parts ( Page 36 ) 2. Checking the Exhaust Equipment ( Page 37 ) Procedure for Turning on the Power 1.

Pushing an Emergency Stop Button for an Emergency Stop ( Page 38 ) 2. Turning On the Power ( Page 38 ) 3. Starting Leonardo ( Page 39 ) 4. Releasing an Emergency Stop Button ( Page 40 ) 5. Executing Setpoint ( Page 42 ) Operations and Check Items After Turning on the Power 1. Checking the Operation of the Emergency Stop Equipment ( Page 43 ) 2. Inspecting for Leaks in the Ink Path ( Page 44 ) 3. Inspecting the Open Cover Detection ( Page 45 ) 4. Nozzle Check ( Page 46 ) 5. Head Cleaning ( Page 49 ) 28