3 Installation and Wiring CP1E Wiring This section provides a brief of grounding wiring as an example. Please refer to the SYSMAC CP series CP1E CPU Unit User Manual for details on CP1E. z Power Connection and Grounding Connect power and ground wires to terminal blocks. 3-2 Equipment Wiring R S MCCB L1 COM 01 03 05 07 09 11 L2/N 00 02 04 06 08 10 3 Note Tighten the AC power cable to the terminal block at a torque of between 0.3 and 0.5 N·m. Loose screws may occasionally result in fire or failure. z Connecting I/O Devices Connect I/O devices to the terminal block.
Input SEN1 LS1 (0.03) (0.05) L1 L2/N COM 01 03 05 07 09 11 00 02 04 06 08 10 SEN2 LS2 (0.04) (0.06) Output MO1 (100.00) MO2 (100.01) L L 00 01 02 03 04 05 07 COM COM COM COM NC NC 06 NB-series Programmable Terminals Startup Guide Manual(V109) 3-7