Nucleo GX Manual Connecting supported non-Victron products Page 57 Shelly energy meters Use the GX device menus to configure how the Shelly energy meter is used and how it is displayed. 1. Go to Devices list. 2. Select the Shelly device to open the device overview. 3. In Setup, configure the following: Role - select how the energy meter is used in the system: • AC load • PV Inverter • Generator Position - Select where the energy meter is installed: • AC Input • AC Output Phase Setting - assign the measured phase: • AC Phase L1 • AC Phase L2 • AC Phase L3 4. Return to the device overview. 5. Select Device to open the device settings.
In the Device menu you can set a custom name and view additional device information, such as connection type, product ID, and VRM instance. 6. Repeat these steps for additional devices.