omron — 3-5-2 Transferring Settings and Programs

3 Implementation Example of Static Pick-and-place Equipment 2 Click the Transfer to Controller button. 3-5 Setup Procedure for Actual System 3 3-5-2 Transferring Settings and Programs 3 Confirm that "The Synchronization process successfully finished." is diaplayed, and then click the Close button. 4 Confirm that the Robot Integrated CPU Unit is turned ON normally. The status of indicators for normal operation is given below. RUN indicator Lit green 3-95 NJ-series Robot Integrated System Startup Guide (O049) Indicators Status