omron — 4-2 Basic Startup Procedures

4 Implementation Example of Dynamic Pick-and-place Equipment 4-2 Basic Startup Procedures This section gives an overview of the basic startup procedures to build a dynamic pick-and-place sys- tem. First, program a machine operation, configure and check the settings using the simulator, and then run the system for fine-tuning the operation. 4-12 NJ-series Robot Integrated System Startup Guide (O049) No. Procedure Description Reference 1 Programming and Simulation Proce- dures Creating a project Create a project file in the Sysmac Studio.

page 4-15 2 Creating the network configuration Create the EtherCAT network config- uration and register an EtherCAT Digital I/O Terminal, an inverter, and a robot on the network. page 4-16 3 Writing V+ programs Create the V+ programs. page 4-19 4 Writing a sequence control program Create a sequences control pro- gram. page 4-23 5 Placing 3D shape data Place 3D shape data and make the operating range of the robot visible on the 3D Visualizer. page 4-30 6 Creating a Pack Man- ager sample Configure the robot settings, camera settings, and conveyor settings by using the simulation function and perform teaching. page 4-53 7 Writing C# programs Create the C# programs.

page 4-81 8 Running the program (Simulation) Run the sequence control program on the simulator of the Sysmac Stu- dio. page 4-87