omron — 4-3-4 Writing a Sequence Control Program

4 Implementation Example of Dynamic Pick-and-place Equipment A tab page to edit the V+ program is displayed in the Edit Pane. 4-3 Programming and Simulation Procedures 5 Create the program in the Edit Pane. For details on the program to create, refer to V+ Program on page 4-6. 6 Go back to step 2 and create another V+ program by repeating the sequence of operations. 4 4-3-4 Writing a Sequence Control Program 4-3-4 Writing a Sequence Control Program This section provides the procedure for creating a sequence control program. For details on the program to create and allocation of V+ digital I/Os, refer to Sequence Control Pro- gram on page 4-4. Create device variables to control the inverter.

1 In the Multiview Explorer, select new_Controller_0 from the device list. 2 Double-click I/O Map under Configurations and Setup in the Multiview Explorer. The I/O Map tab page is displayed in the Edit Pane. 4-23 NJ-series Robot Integrated System Startup Guide (O049) Creating Device Variables