omron — 4-3-6 Creating a Pack Manager Sample

4 Implementation Example of Dynamic Pick-and-place Equipment 4-3 Programming and Simulation Procedures 7 Click the Finish button. 4 4-3-6 Creating a Pack Manager Sample The dialog box closes and Pick and Place Sequence: Phase 1/3 - Select Robot dialog box is displayed. Configuring the Robot In this section, select the robot and end effector to use for the Pack Manager and teach the wait posi- tions. 1 In the Introduction page, click the Next button. 4-59 NJ-series Robot Integrated System Startup Guide (O049)