4 Implementation Example of Dynamic Pick-and-place Equipment 4-3 Programming and Simulation Procedures 11 Click the ON/OFF button to turn it ON, and then click the Start Tracking button to check that the robot can successfully track along the conveyor. If no problem was found, click the Next button at the bottom right of the dialog box. 4 4-3-6 Creating a Pack Manager Sample 12 Make sure that the right latch number has been selected , and then click the Next button. 4-71 NJ-series Robot Integrated System Startup Guide (O049)