omron — 4-5-5 Running a Sequence Control Program and V+ Program

4 Implementation Example of Dynamic Pick-and-place Equipment Calibration is performed. Yellow points in the black dots mean the calibration has been successfully done. If yellow points are not shown, click the Back button to return to Step 4, then re-adjust properties so that the dots get clear. 9 Click the Finish button. The Grid Pixel Calibration dialog is closed. 4-5-5 Running a Sequence Control Program and V+ Program To operate the conveyor belt for a calibration, run a sequence control program and V+ program. 1 Select Operation Mode - RUN Mode from the Controller menu. 2 Select View - Task Status Control from the menu bar. 4-126 NJ-series Robot Integrated System Startup Guide (O049)