Downloaded from https://www.everyspec.com TOP 1-2-621 6 February 2009 Figure 2. Typical Air Flow Straightener with 245 HP Wind Generator 2.3 Equipment Calibration. a. All test equipment shall be calibrated in accordance with International Standards Organization (ISO) 10012-1 2 with calibration traceable to the National Institute of Standards and Technology. All calibration records shall be maintained on file and made available for inspection as required. b.
The accuracy of instruments and test equipment used to control or monitor the test parameters shall be verified prior to and following each test then calibrated in pre-determined intervals and shall meet the requirements of ISO 10012-1 to the satisfaction of the procuring activity. 3. REQUIRED TEST CONDITIONS. 3.1 Test Objectives and Approach. The UUT (missiles, rockets, launchers, ground support vehicles, unmanned aerial vehicles, etc.) is usually subjected to the various environmental tests defined in the system Life Cycle Environmental Profile. The blowing sand and blowing dust tests are often performed as two distinct tests near the end of the climatic test sequence.
These tests can easily be conducted on small items in standard test chambers. For large test items, a different test method is required due to the unavailability of large sand/dust test chambers. The tests outlined below provide an alternative which roughly approximates the damage effects of the MIL-STD-810 sand and dust test methods. 5