Chapter 5 – Technical Procedures The disassembly procedures listed in chapters 2 and 3 provide a step-by-step process to remove components in the Neptune Waste Management System. The procedures in chapter 5 are provided to outline the steps necessary in a process other than removal. Each process guides the technician from start to finish through procedures that mostly require navigation through the Rover’s software menus. Included in this chapter are:
Field calibration Electrical safety and testing Detailed description of how to manually control the docking station Multiple procedures designed to help the technician troubleshoot Chapter 6 – Installation This section provides the technician with the information required to install a Neptune 2 Waste Management System. Chapter 7 – Appendices The appendices section provides information for the technician that falls outside of the information provided in each of the previous chapters. Appendix A is the section on the 230V Ultra Rover/ Docker troubleshooting and component removal/replacement.
This provides the international technician with instruction to remove/replace components, troubleshooting, as well as electrical safety and functional testing information. xi 0000026959, Rev. C Effective Date: Dec 16, 2014 3:43:21 PM Print Date: Dec 16, 2014 04:03:57 PM