SC111 Chassis Manual ! ! Warnings and Precautions! Rack Precautions Ensure that the leveling jacks on the bottom of the rack are fully extended to t the floor with the full weight of the rack resting on them. In single rack installation, stabilizers should be attached to the rack. t In multiple rack installations, the racks should be coupled together. t Always make sure the rack is stable before extending a component from the t rack. You should extend only one component at a time - extending two or more si- t multaneously may cause the rack to become unstable.
General Server Precautions Review the electrical and general safety precautions that came with the com- t ponents you are adding to your chassis. Determine the placement of each component in the rack t before you install the rails. Install the heaviest server components on the bottom of the rack first, and then t work up. Use a regulating uninterruptible power supply (UPS) to protect the server from t power surges, voltage spikes and to keep your system operating in case of a power failure. Allow the hot plug hard drives and power supply modules to cool before touch- t ing them.
Always keep the rack's front door and all panels and components on the servers t closed when not servicing to maintain proper cooling. 6-2