SC812L Chassis Manual Figure 5-6: Installing the Server into a Telco Rack 5. Place one outer rail in the Telco rack as illustrated. 6. Slide the brackets until each snugly fi ts against the Telco rack post. 7. Secure the brackets to the Telco rack with two M5 screws for each bracket. 8. Tighten the M4 screws that secure each bracket to the outer rail. 9. Repeat steps 5 - 9 using the second outer rail. 10. Line the inner chassis rails (A) with the front of the outer rails (C) (see Figure 5-3). 11. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting).
When the server has been pushed completely into the rack, you should hear the locking tabs "click". 5-10