SC846 Chassis Manual 5-3 Warnings and Precautions Rack Precautions Ensure that the leveling jacks on the bottom of the rack are fully extended to the floor with the full weight of the rack resting on them. In single rack installations, stabilizers should be attached to the rack. In multiple rack installations, the racks should be coupled together. Always make sure that the rack is stable before extending a component from the rack. Only one chassis should be extended from the rack at a time. Extending two or more chassis simultaneously may cause the rack to become unstable.
When initially installing the server to a rack, test that the rail locking tabs engage to prevent the server from being overextended. Have a rack lift in place as a precaution in case the test fails. In any instance of pulling the system from the rack, always use a rack lift and follow all associated safety precautions. General Server Precautions Review the electrical and general safety precautions that came with the components you are adding to your chassis. Determine the placement of each component in the rack before you install the rails. Install the heaviest server components on the bottom of the rack first, and then work upward.
Use a regulating uninterruptible power supply (UPS) to protect the server from power surges, voltage spikes and to keep your system operating in case of a power failure. Allow the hot-swappable hard drives and power supply modules to cool before touching them. Always keep the rack's front door and all panels and components on the servers closed when not servicing to maintain proper cooling. 5-2