ASS LY Figure i showsthe snowthrowerin the shipping position,, CONTROL LOWER HANDLE PANEL Figure 2 shows the snow thrower completely assembled,, Reference to the right and left hand side of the snow thrower is from the operator's position at the handler TO REMOVE SNOW THROWER CRANK ASSEMBLY CLUTCH CABLE FROM CARTON (See Fig 1) e Cut all four corners of the carton from top to bottom and lay the panels flat.. ® Cut the cable ties attached to the auger,, HANDLE ASSEMBLY e Cut and discard the plastic ties that secure the crank assembly and place the assembly aside,, ® Remove the packing material from the control panelo FIG.
1 e Cut and discard the packing securing the clutch cables to the handles. o Loosen (do not remove) both botts securing the upper and lower handles., Swing the upper handle into the operating position. NOTE: Ifthe cables have become disconnected fromthe clutch levers, reinstall the cables as shown in Figure 3. ® Tighten both bolts securely.. e Roll the snow thrower off the skid by pulling on the handle., NOTE:
This snow thrower is equipped with a track drive and can be hard to push when the engine is not running It is easier to pull the snow thrower backward if it must be moved without the engine running The drive system may be tight when you first use your snow thrower tt loosens up as you use it HOW TO SET UP YOUR SNOW THROWER TO SET THE SKID HEIGHT FIG. 2 ® To adjust the skids height for different conditions, see To Adjust Skids Height paragraph on page 17,, i, CAUTION:
IF YOU ARE REMOVING DRIVE "Z" FITTING LEVER SNOW FROM ANY ROCKY OR UNEVEN SURFACES, RAISE THE FRONT OF THE SNOW THROWER BY MOVING THE SKIDS DOWN, THIS WILL HELP TO PREVENT ROCKS AND OTHER DEBRIS FROM BEING PICKED UP AND THROWN BY THE AUGER. ._"I'HI'H I I I ,III FIG. 3 7