Downloaded from https://www.everyspec.com MIL-HDBK-683(AT) f. Management atmcture g- Training plan h. S~lier SPC philoso~ and policy i. Systematic process 4.?.1 # The Plicy statement statea the detailed requir~nts of SPC and who ia ~sponsible for implementing the ~bnti. 4.’?.2 . The goals clearly define the stop of the products and proceaees to be addreBsed by SPC and the e~tations for quality levels at each o~ration. The quality targets for each product should be established by the contractor and subject to Government a~val. 4.7-3 . The Master Milestone Plan identifies the products and procesaea tire S= is to be implemented in accordance to a time phased schedule.
The schedule would reflect the month to etart the S= implementation and the month that the pmceas will be in control and achieve the quality target for the process. The Master Milestone Plan is to be initially approved by the Government prior to implementation b the contractor. Also all reviaiona require hvernment approval. L e statue of the Master Milestone Plan should be issued monthly by the contractor, or on 8ome other cyclic baeiO ae required by the Government. 4-7.4 ~ A Project Milestone Plan identifies the key activities of each project where SPC will be Implemented in accordance to a time phase schedule. The activities would & the proceeB which ia advocated.
The schedule would reflect the week ‘*tostart” each activity and the week ‘“tocomplete” each activity. The Project Milestone Plan would be auhitted for Government approval and should contain all projects planned to be started in the first three (3) months of the Master Milestone Plan. Each month, one additional month ia added to it. The following activities shouldbe planned in the Project Milestone Plan and a~ved by the Govenrment: a. Determine the classification of characteristics b. conduct inspection capability study c. Conduct process capability study d. Prepare the re~ir and corrective actions e- Prepare the process control procedure f. Implement process control charts g- Audit 32