Chapter 2: Server Installation 2-6 Checking the Serverboard Setup After you install the 2122TC-H6RF4 in the rack, you will need to open the unit to make sure the serverboard is properly installed and all the connections have been made. Before operating the SC217 chassis for the first time, it is important to remove the protective film covering the top of the chassis, in order to allow for proper ventilation and cooling. Removing the Chassis Cover and Protective Film 1. Uplug the AC power cord from any external power source. 2. Remove the two screws which secure the top cover onto the chassis as shown above. 3. Lift the top cover up and off the chassis. 4.
Peel off the protective film covering the top cover and the top of the chassis 5. Check that all ventilation openings on the top cover and the top of the chassis Replace the chassis cover and reconnect the AC power cord. are clear and unobstructed. 2-9