Supermicro SBB 937R-E2JB — Supermicro SBB 937R-E2JB User Manual: Comprehensive Guide for System Integrators

Chapter 2: Server Installation Chapter 2 Server Installation 2-1 Overview This chapter provides a quick setup checklist to get your SBB 937R-E2JB up and running. Following these steps in the order given should enable you to have the system operational within a minimum amount of time. 2-2 Unpacking the System You should inspect the box the SBB 937R-E2JB was shipped in and note if it was damaged in any way. If the server itself shows damage you should fi le a damage claim with the carrier who delivered it. Decide on a suitable location for the rack unit that will hold the SBB 937R-E2JB. It should be situated in a clean, dust-free area that is well ventilated.

Avoid areas where heat, electrical noise and electromagnetic fi elds are generated. You will also need it placed near a grounded power outlet. Read the Rack and Server Precau- tions in the next section. 2-3 Preparing for Setup The box the SBB 937R-E2JB was shipped in should include two sets of rail assem- blies, two rail mounting brackets and the mounting screws you will need to install the system into the rack. Follow the steps in the order given to complete the installation process in a minimum amount of time. Please read this section in its entirety before you begin the installation procedure outlined in the sections that follow.

Choosing a Setup Location Leave enough clearance in front of the rack to enable you to open the front door completely (~25 inches) and approximately 30 inches of clearance in the back of the rack to allow for suffi cient airfl ow and ease in servicing. This product is for installation only in a Restricted Access Location (dedicated equipment rooms, service closets and the like). 2-1