Chapter 2: Server Installation Chapter 2 Server Installation 2-1 Overview This chapter provides a quick setup checklist to get your A+ Server 1012A-MTF up and running. Following the steps in the order given should enable you to have the system operational within a minimal amount of time. This quick setup assumes that your A+ Server 1012A-MTF system has come to you with the processor and memory preinstalled. If your system is not already fully integrated with a mother board, processor, system memory etc., please turn to the chapter or section noted in each step for details on installing specific components.
2-2 Unpacking the System You should inspect the box the A+ Server 1012A-MTF was shipped in and note if it was damaged in any way. If the server itself shows damage, you should file a damage claim with the carrier who delivered it. 2-3 Preparing for Setup Decide on a suitable location for the rack unit that will hold the A+ Server 1012A- MTF. It should be situated in a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical noise and electromagnetic fields are generated. You will also need it placed near a grounded power outlet. Read the Rack and Server Precautions in the next section.
The box the A+ Server 1012A-MTF was shipped in should include two sets of rail assemblies, six rail mounting brackets and the mounting screws you will need to install the system into the rack. Follow the steps in the order given to complete the installation process in a minimal amount of time. Please read this section in its en tirety before you begin the installation procedure outlined in the sections that follow. Choosing a Setup Location Leave enough clearance in front of the rack to enable you to open the front door completely (~25 inches) and approximately 30 inches of clearance in the back of the rack to allow for sufficient airflow and ease in servicing.This product is for 2-1