Supermicro 8048B-TR4F/C0R4FT — Supermicro SUPERSERVER 8048B-TR4F/C0R4FT User's Manual (PDF)

SUPERSERVER 8048B-TR4F/C0R4FT User's Manual A reliable ground must be maintained at all times. To ensure this, the rack itself should be grounded. Particular attention should be given to power supply connections other than the direct connections to the branch circuit (i.e. the use of power strips, etc.). Reliable Ground 2-5 Installing the System into a Rack This section provides information on installing the SC748 tower/4U rackmount chassis into a rack unit with the rails provided. There are a variety of rack units on the market, which may mean the assembly procedure will differ slightly. You should also refer to the installation instructions that came with the rack unit you are using. NOTE:

The outer rail is adjustable from 26" to 38.25". Warning: Do not pick up the server with the front handles. They are designed to pull the system from a rack only. Stability Hazard: The rack stabilizing mechanism must be in place, or the rack must be bolted to the fl oor before you slide the unit out for servicing. Failure to stabilize the rack can cause the rack to tip over. Warning: Slide rail mounted equipment is not to be used as a shelf or a work space. Warning: When initially installing the server to a rack, test that the rail locking tabs engage to prevent the server from being overextended. Have a rack lift in place as a precaution in case the test fails. Warning:

In any instance of pulling the system from the rack, always use a rack lift and follow all associated safety precautions. Removing the Feet The SC748 tower/4U rackmount chassis is shipped with the chassis cover and feet pre-installed. Both the feet and cover must be removed for before installing the rails (see Figure 2-1). Removing the Chassis Top Cover 1. Locate the chassis cover lock (blue lever) at the rear of the chassis cover. 2. Slide the chassis cover lock to the right and push chassis cover forward. 3. Lift the chassis top cover off the chassis. 2-4